crawling out from under my rock.
Posted: Fri May 23, 2008 9:53 pm
But not for long.
I move tomorrow packed the apt in 1 day. I've spent every evening and weekend working on a house over on loch raven. Its not fully done but the bedroom ready and theres a coat of paint done in the living room lol.
House was built in '52 or so. 3b 1 and 1/2 bath finished basement.
it had paneling in that was up up in '71. I ripped it all out to discover layer upon layer of wall paper it was about 1/8 of an inch thick. Haven't even stripped the dinning room completely yet.
It was a huge under taking and my time table was now I see un realistic without a lot of help.
Sat get installed Sun the DSL on or before June 4th.
I also have a new job
Director of Maintenance for a parking company in DC. Pays well work Mon thru Friday now. Very busy tho a lot of projects going on and to oversee.
I move tomorrow packed the apt in 1 day. I've spent every evening and weekend working on a house over on loch raven. Its not fully done but the bedroom ready and theres a coat of paint done in the living room lol.
House was built in '52 or so. 3b 1 and 1/2 bath finished basement.
it had paneling in that was up up in '71. I ripped it all out to discover layer upon layer of wall paper it was about 1/8 of an inch thick. Haven't even stripped the dinning room completely yet.
It was a huge under taking and my time table was now I see un realistic without a lot of help.
Sat get installed Sun the DSL on or before June 4th.
I also have a new job
Director of Maintenance for a parking company in DC. Pays well work Mon thru Friday now. Very busy tho a lot of projects going on and to oversee.