We'll after 2 years of work progressing to 60+hrs a week Mon-Sat, things are going to change next week hopefully for the better. My place of work is switching to a 3day work week...
3days on 4 days off
Then once a month there's a week off and a week on. Hopefully this is going to work out but the number one thing that conserns me is going from a pay check with 60hrs in it down to 35-40. Granted the overtime has been nice, I probably should not have counted on it being permanent.
So next week my work shedule starts off:
Thurs - 7:30am-9pm
Fri - 7:30am-6pm
Sat - 7:30am-6pm
This will continue through the month until July where it switches in the first week then I'll work
Mon - 7:30am-9pm
Tues - 7:30am-9pm
Wed - 7:30am-9pm
Which means the weekend for Carlisle I'll be scheduled off and I don't need to use vacation time this year.....
Hopefully my health can handle 13.5hr days :banghead:

User avatar
hansken_yo
2GN Veteran
Posts: 5148
Joined: Wed Oct 11, 2006 10:54 am
Location: Washington

Post by hansken_yo » Thu May 27, 2010 10:29 am

Holy shit yo... what is your profession?
Image
| - John || Project Log || Official I'm Going To Drive My Neon Till It Dies Club #000001 |
Everyone knows that for breasts to be "perfect" they need to be within reach.

Midnight_Rider
2014 Platinum Contributor
Posts: 8452
Joined: Wed Aug 02, 2006 2:49 am
Location: Indianapolis, IN

Re: Upcoming new work schedule

Post by Midnight_Rider » Thu May 27, 2010 11:47 am

BlackRoseRacing wrote:Hopefully my health can handle 13.5hr days :banghead:
Eh, with all of the time off every few weeks, you'll do okay. I've been working hours like those for years and you're a lot younger than me.
Official "I'm Going To Drive My Neon 'til It Dies" Club #10

User avatar
BlackRoseRacing
2009 Platinum Contributor
Posts: 12729
Joined: Sat Dec 25, 2004 8:58 am

Post by BlackRoseRacing » Thu May 27, 2010 12:26 pm

I work Parts, Service, IT, and whatever else is needed

User avatar
LowNSlow
Moderator
Posts: 5016
Joined: Wed May 12, 2004 12:45 am
Location: Houston TX
Contact:

Post by LowNSlow » Thu May 27, 2010 12:45 pm

I like those hours....

My last shop we worked 12 hour days, 5 days a week for like 5 months :(
-John


Image

occasional demons
Junior Admin
Posts: 20064
Joined: Thu May 03, 2007 12:14 pm
Location: Ashland Ohio

Post by occasional demons » Thu May 27, 2010 12:53 pm

My dad worked 12 hour days 6 days a week for years. 1 hour drive each way. I don't know how the hell he did it.

The old bastid has more energy than me, and he's turning 69 in July. Better than the other way around tho. :thumbup:
Bill
Probably shouldn't listen to anything your penis says, that guy's a dick.
Patience, of course, is a very powerful weapon, but sometimes I start to regret that it is not a firearm.
Too much time spent here is a sign of a bad case of Ownaneonvirus.

2000 Neon MTX swap with '02 R/T PCM
1999 neon coupe 2.4 swap

User avatar
rOniN
2GN Member
Posts: 1300
Joined: Fri Sep 09, 2005 1:21 am
Location: Honolulu, HI

Post by rOniN » Thu May 27, 2010 5:18 pm

I'm with John

I work 12-15 hour days mon-fri and then all the extra paperwork that no one thinks about after that...

I would love that schedule though...4 days off 3 on is something to dream of!
Image
-Chad
2009 Dodge Viper VOI #66
2010 Dodge Ram Power Wagon - Sold
2010 Dodge Challenger SRT-8 - Sold
2009 Dodge Challenger SRT-8 -Sold
2004 Dodge Neon SRT-4 - Sold
1998 Dodge Neon R/T

cbjones26
2010 Platinum Contributor
Posts: 1479
Joined: Mon Mar 24, 2008 12:03 am
Location: NY

Post by cbjones26 » Thu May 27, 2010 9:51 pm

ill trade you im on 7-3 3-11 11-7 all in the same week, if its 90 outside its 120+ inside ( in the cool areas) 200+ in the hotter areas. 7 on 2 off ,for 3 weeks then 7 on 3 off and back to 7 on 2 off ( i hate midnights)

FAC3L3SS
2GN Veteran
Posts: 6517
Joined: Thu Apr 12, 2007 8:58 pm
Location: NIN

Post by FAC3L3SS » Thu May 27, 2010 9:53 pm

We used to work Sunday-Weds night, 8p-6a and it was amazing. Shitty trying to sleep @ night for 3 days just to go back to night shifts for 4, but it was the best work shift I've found yet.
el. oh. el.

User avatar
BlackRoseRacing
2009 Platinum Contributor
Posts: 12729
Joined: Sat Dec 25, 2004 8:58 am

Post by BlackRoseRacing » Thu May 27, 2010 10:23 pm

damn,
after hearing all the replies....what ever happened to the 9-5 job :roll:
It seems a few of us work odd schedules compared to the average person. I keep hearing how I'm going to a great schedule, but the biggest thing thats goin to hurt me is a paycheck based on 55-60hrs a week being cut down to 35-40hrs a week. I'ts a good thing I got most of my bills situated, hopefully the cut in hours won't hurt me too much :banghead:

Mr Josh Zombie
2010 Platinum Contributor
Posts: 8357
Joined: Tue Aug 22, 2006 8:43 pm
Location: Toledo, OH

Post by Mr Josh Zombie » Thu May 27, 2010 11:00 pm

Meh, I work 9-5. I hate it
Modify your Car • Modify your Body • Modify your Life

Midnight_Rider
2014 Platinum Contributor
Posts: 8452
Joined: Wed Aug 02, 2006 2:49 am
Location: Indianapolis, IN

Post by Midnight_Rider » Fri May 28, 2010 3:55 am

When I worked in IT back in the 80's, I had a rotating schedule for a while that was 7 p.m. to 7 a.m. for about nine days straight and then four or five days off. I really liked it, took a lot of short trips around the midwest in my trusty Omni.
Official "I'm Going To Drive My Neon 'til It Dies" Club #10

User avatar
BlackRoseRacing
2009 Platinum Contributor
Posts: 12729
Joined: Sat Dec 25, 2004 8:58 am

Post by BlackRoseRacing » Fri May 28, 2010 5:45 am

I have a feeling there still going to call me in on my days off....
There talking about moving things around in service Tues/Wed next week which is going to require someone to run phone line,Net cables, PC's...
I have a feeling that I'll still be showing up to work on my days off :banghead:

Fuzzyneon
2009 Silver Contributor
Posts: 4872
Joined: Fri Oct 26, 2007 12:48 am
Location: Waterford works ,NJ

Post by Fuzzyneon » Fri May 28, 2010 6:17 pm

Mr Josh Zombie wrote:Meh, I work 9-5. I hate it
Me to
Member of Spork Racing
2002 Dodge Neon
Frankenstien



neonslg09
2GN Veteran
Posts: 5590
Joined: Wed May 06, 2009 7:17 pm
Location: Fredericksburg, Virginia

Post by neonslg09 » Fri May 28, 2010 10:25 pm

Fuzzyneon wrote:
Mr Josh Zombie wrote:Meh, I work 9-5. I hate it
Me to
8-530 here.

User avatar
dblsg
2GN Veteran
Posts: 10719
Joined: Fri Jun 03, 2005 3:20 am
Location: Aurora, IL
Contact:

Post by dblsg » Sat May 29, 2010 8:08 am

my normal work hours were 3 p.m. to 11:30 p.m. with thursdays and fridays off...
Image Sam-I-Am
Image
Official "I'm Going to Drive My Neon till it Dies" Club #000046
Diablo0 wrote: "eh... your opinion doesn't matter... I'm doing what I want..."

User avatar
BlackRoseRacing
2009 Platinum Contributor
Posts: 12729
Joined: Sat Dec 25, 2004 8:58 am

Post by BlackRoseRacing » Tue Jun 08, 2010 8:37 am

We'll so far I'm liking this new schedule....
My 4 year old is not used to having Daddy home all day. I had yesterday off too and it was great, I was actually able to pick up some misc supplies to get the car done and not have to worry about doing it on my lunch break or right after work.
I may start to like this new schedule after all....

Paul56
2GN Member
Posts: 978
Joined: Sun Sep 09, 2007 1:11 pm
Location: Texas

Post by Paul56 » Tue Jun 08, 2010 1:42 pm

I'm on a 9 - 5 job... and even with that I tend to get sleepy around 2 - 3pm in the afternoon. Something to do with circadian rhythm. On those 13 hour days you will basically have no life other than work, eat and sleep.

When I was driving truck my hours were more like 13/day. I suppose if I had to do it over again I could... but that was only one of the reasons I escaped from driving for a living.
2011 Honda Fit Sport

racer12306
Junior Admin
Posts: 16015
Joined: Sun Oct 24, 2004 8:53 pm
Location: Baltimore, MD
Contact:

Post by racer12306 » Tue Jun 08, 2010 1:57 pm

I'm on a start when I need to when the job ends.

Days can start as early as 4:30a like on Monday and end at 12:00a like when flying home late like last week when I flew to Austin and home in one day.
-Frank
Member of Spork Racing
Forum issues: racer12306@2gn.org
Forum Behavior
Support your favorite forum, DONATE!

dtjackten
2GN Member
Posts: 2948
Joined: Tue Feb 26, 2008 7:14 pm

Post by dtjackten » Tue Jun 08, 2010 2:34 pm

7-6 mon-fri. nice to have the weekends off though, my first job in my whole life that i have the weekends off.....
304whp and 285 ft lbs.... 15psi.
*on the way to 400whp*
dave

Image

JRM
2GN Member
Posts: 3512
Joined: Mon Sep 12, 2005 7:35 pm
Location: MO

Post by JRM » Tue Jun 08, 2010 2:42 pm

7a-5p Monday to Saturday