Post
by dtjackten » Mon Mar 17, 2014 6:11 pm
it has been a while since i have posted on my progress... but as zero parts have been installed on the car, MANY parts have been collected for the car when it is able to get out of the garage that it is stored.
parts list that sits on my workbench is....
supercharger (of course)
rt head, with some fun upgrades
half radiator x 2, two options for test fit using 1
flex a lite rad fan
wilwood big brake kit
srt spindels with extended wheel studs
intake and exhaust gaskets
coil on plug setup
rear dcr adjustable lcas
bov flange
rear extended wheel studs
custom supercharger mount, to place the supercharger below the intake manifold
wheel spacers
parts to come.
motor mounts for xi tuned
intercooler piping kit from xi tuned
lsd trans
tial q secondary bov
possible sidewinder manifold depending on several things...
build date has been pushed to aug. pushing the build to aug will do several things, it will get me some time to drive and enjoy the car. it will also get me a new inspection for a full year that i can have the time to get it threw inspection after the twin charge setup is up and running..... i will be doing the the wilwood big brake kit, and adjustable control arms and driving the car till aug. hoping to pull the block, trans. and installing everything at one time.. cleaning up the engine bay at the same time... end date is hitting a local show at the end of sept. . that is if EVERYTHING goes well...
304whp and 285 ft lbs.... 15psi.
*on the way to 400whp*
dave